: Public Note
| Created: |
3/15/2016 4:58:32 PM |
| Modified: |
3/17/2016 11:06:06 AM |
|
Project: |
|
| Author: |
wverhoef |
| Version: |
1.0 |
| Phase: |
1.0 |
| Status: |
Proposed |
| Complexity: |
Easy |
| Difficulty: |
|
| Priority: |
|
| Multiplicity: |
|
Advanced: |
|
| UUID: |
{D718E25E-C142-4936-9B5A-CAFCFD476467} |
| Appears In: |
Activities |
View Description: This Diagram represents the progressive addition of contextual information as activities are involved in Studies or Experiments. DefinedActivities have no context, just like a global library of things that can occur during the context of a study. StudyActivities associate a DefinedActivity to a StudyProtocolVersion without assigning a relative time to it - just identifying that the activity will be used in the plan at some point. PlannedActivities place the StudyActivity in the context of a relative timepoint in the course of a study or subject's participation in the study, forming a planned study calendar. ScheduledActivities apply the PlannedActivities to a specific subject so the study calendar is now anchored to a real point in time. PerformedActivities are ones that have occurred or at least begun and are done for a specific subject, site or study.<br/>