: Public Class
Created: 7/27/2006 12:04:00 PM
Modified: 8/26/2019 12:59:07 PM
Project:
Advanced:
DEFINITION:<br/>An activity that is anticipated to occur at some time in the future and has been assigned a time or date when that activity is to be performed.<br/><br/>EXAMPLE(S):<br/>An X-Ray scheduled for February 15 is in state "Scheduled."  If John is unable to have the X-Ray on that date, the X-Ray would either be rescheduled (remain in "Scheduled" state, but "date" attribute would change) or moved to state "Canceled."  <br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>
Attribute
Public INT.POS
  repetitionNumber
Details:
Map:PSC=Period.repetitions
Map:PSCv2.6=ScheduledActivity.repetitionNumber
Notes: DEFINITION: <br/>An integer that identifies the particular occurrence of a repeating activity. The first repetition is defined as '1'.<br/><br/>EXAMPLE(S): <br/>A PlannedActivity might have a repeatQuantity of 4 which would result in 4 ScheduledActivity with repetitionNumbers of 1, 2, 3, and 4 respectively.<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>The ScheduledActivity will repeat at least the minimum number of times and at most, the maximum number of times as defined in PlannedActivity.repeatQuantity.<br/>
Public IVL<TS.DATETIME>
  dateRange
Details:
Map:caAERSv2.2=ScheduledNotification.scheduledOn
Map:HCTv1.0=CDE 3158501:Therapies.Scheduled infusion date:
Map:HCTv1.0=CDE 2866945:Therapies.If this HSCT was postponed, what is the new estimated date?
Map:NCI CRF Standard=CDE 657v3.0: Treatment Projected Begin Date
Map:PRM=Period.startDay
Map:PSC=ScheduledEvent.date/idealDate
Map:PSC=ScheduledEventState.scheduled
Map:PSC=Scheduled.date
Map:PSCv2.6=ScheduledStudySegment.startDate
Map:SDTM IGv3.2=EC.ECSTDTC
Map:SDTM IGv3.2=EC.ECENDTC
Notes: DEFINITION:<br/>The date and time span specifying when the activity is scheduled to begin and end. <br/><br/>EXAMPLE(S):<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>
Public IVL<TS.DATETIME>
  idealDateRange
Details:
Map:PSCv2.6=ScheduledActivity.idealDate
Notes: DEFINITION:<br/>The date and time span specifying when the activity was originally scheduled to begin and end.<br/><br/>EXAMPLE(S):<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>This would be the date and time span based on applying the study or experiment calendar to a specific subject.<br/>
Public CD
  statusChangeReasonCode
Details:
Map:PSCv2.6=ScheduledActivityState.reason
Notes: DEFINITION:<br/>A coded value specifying why the status has changed.<br/><br/>EXAMPLE(S):<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>
Public CD
  statusCode
Details:
Map:PSC=ScheduledEventState
Notes: DEFINITION:<br/>A coded value specifying the phase in a lifecycle of a scheduled activity.<br/><br/>EXAMPLE(S):<br/>For a lab test, this would be the condition or stage in the lifecycle of the test (e.g., "scheduled", "canceled", "performed").<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>Please refer to the Scheduled Activity Status state transition diagram for further details.<br/>
Public TS.DATETIME
  statusDate
Details:
Map:PSC=ScheduledEventState.canceled
Notes: DEFINITION:<br/>The date (and time) on which the status is assigned to the activity.<br/><br/>EXAMPLE(S):<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/>
Public IVL<TS.DATETIME>
  studyDayRange
Details:
Map:SDTM IGv3.1.2=EC.ECENDY
Map:SDTM IGv3.1.2=EC.ECSTDY
Notes: (derived)<br/>DEFINITION:<br/>The relative timing for a scheduled activity expressed as the number of days offset from the study-defined reference activity (e.g., date of registration, start of treatment) for this particular experimental unit.<br/><br/>EXAMPLE(S):<br/>Day 1, Days 10-20<br/><br/>OTHER NAME(S):<br/>Study Day<br/><br/>NOTE(S):<br/>Derived from the dateRange of this activity minus the dateRange of the reference activity + 1.<br/><br/>The study-defined reference activity can be different from study to study. The study day for a date after this reference activity is a positive integer calculated as the difference in the two dates + 1.  The study day for dates before the reference activity is a negative integer calculated as the difference between the two dates. Note that this means there is no "Day 0."<br/>
Element Source Role Target Role
PlannedActivity
Class  
Name: instantiatingScheduledActivity
 
Name: instantiatedPlannedActivity
 
Details:
DESCRIPTION:<br/>Each ScheduledActivity always instantiates one PlannedActivity. Each PlannedActivity might be instantiated by one or more ScheduledActivity.<br/><br/>DEFINITION:<br/><br/>EXAMPLE(S):<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/><br/>
Element Source Role Target Role
PerformedActivity
Class  
Name: instantiatingPerformedActivity
 
Name: instantiatedScheduledActivity
 
Details:
DESCRIPTION:<br/>Each PerformedActivity might instantiate one ScheduledActivity. Each ScheduledActivity might be instantiated by one or more PerformedActivity.<br/><br/>DEFINITION:<br/><br/>EXAMPLE(S):<br/><br/>OTHER NAME(S):<br/><br/>NOTE(S):<br/><br/>
Tag Value
Map:PSCv2.6 Canceled
Details:
 
Map:PSCv2.6 Scheduled
Details:
 
Map:PSCv2.6 Conditional
Details:
 
Map:PSCv2.6 ScheduledStudySegment
Details:
 
Map:PSCv2.6 ScheduledActivity
Details:
 
Map:PSCv2.6 NotApplicable
Details:
 
Map:PSCv2.6 Missed
Details:
 
Map:SDTM IGv3.2 EC.ECMOOD
Details:
 
Constraint Type Status
be participated in by actualIndicator Qualifier Invariant Approved
Details:
Only BiologicEntity, BiologicEntityGroup, Material, ProductGroup or Organization (via Subject or ExperimentalUnit) with actualIndicator = "true" are valid. <br/>
Object Type Connection Direction Notes
ScheduledNotification Class Generalization From DESCRIPTION: Each ScheduledNotification always specializes one ScheduledActivity. Each ScheduledActivity might be specialized by one ScheduledNotification. DEFINITION: EXAMPLE(S): OTHER NAME(S): NOTE(S):
ScheduledSubstanceAdministration Class Generalization From DESCRIPTION: Each ScheduledSubstanceAdministration always specializes one ScheduledActivity. Each ScheduledActivity might be specialized by one ScheduledSubstanceAdministration. DEFINITION: EXAMPLE(S): OTHER NAME(S): NOTE(S):
Activity Class Generalization To DESCRIPTION: Each ScheduledActivity always specializes one Activity. Each Activity might be specialized by one ScheduledActivity. DEFINITION: EXAMPLE(S): OTHER NAME(S): NOTE(S):